Developing Innovative Approaches Beyond Design Build to Improve Efficiency

  • Comparing two mission critical projects’ time and cost savings to standard design-bid-build using a new approach
  • Starting the construction model during design at LOD400 so when design drawings are finished we already have nearly constructable, fabrication-level documents
  • Sharing how this removes trade contractor modelling and cuts coordination time, enabling prefab assemblies and faster installs
  • Quantifying our savings and creating a plan to scale from proof-of-concept to a standardized national approach